Does the assessment include production changes?
No. See the scope boundary above for the assessment and any later production work.
Existing system
CTM begins with an authorized, read-only current-state assessment and a ranked plan rather than an unplanned production change.
The right path depends on evidence. A system may need clearer ownership, verified backups, dependency documentation, a narrow repair, an upgrade plan, or a migration assessment. CTM separates immediate operational risk from longer-term platform preference so that urgency does not become permission to guess.
The initial assessment is authorized and read-only. It does not authorize restarts, upgrades, restore tests, database edits, credential changes, or workflow modifications. Later production work requires a separate scope, named authority, backup and rollback evidence, acceptance checks, and a maintenance decision. This is not emergency incident response; uncertain access or authority must be resolved before work begins.
This service can fit an inherited or aging laboratory system with unclear ownership, support, recoverability, or change risk. If the lab has not yet decided whether to preserve or leave the current platform, begin with the LIMS stabilize, upgrade, or replace assessment.
No. See the scope boundary above for the assessment and any later production work.
No. The assessment gathers evidence and ranks options; feasibility depends on the actual system, dependencies, and available authority.
Not solely for this review. Locate existing evidence and procedures, but do not run an unapproved restore against production.
Architecture notes, owner and vendor contacts, backup documentation, dependency lists, incident history, and examples of critical outputs are useful when shared safely.
The lab depends on an inherited LIMS but cannot confidently explain its support, dependencies, or change risk.
The inventory, critical-workflow map, recoverability questions, and ranked options above provide a decision-ready handoff.
Documentation gaps, dependency age, legitimate access availability, vendor support, and the number of workflows and interfaces at risk. Later remediation is scoped separately.
Fees and schedule are proposed after fit and scope are confirmed; they are not fixed by this page.
Use the stabilization checklist to locate existing documentation and describe the operational risk; do not perform new production tests for intake.
Use the existing systems-need link on this page. Do not include credentials, regulated records, production exports, or client-sensitive material in initial intake.